Novatelx Discuss a requirement
Home/Solution packages/Transmission: optical, microwave & IP backhaul
Package 04 · Telecom

Transmission: optical, microwave & IP backhaul

The transport layer that carries traffic between sites, cities and the core. Transmission is the layer that carries traffic between sites, cities and the core. Capacity, latency and resilience are set here, so it is designed as one system rather than link by link.

Telecom · Egypt & MENA
Why it matters

The transport layer that carries traffic between sites, cities and the core.

Transmission is the layer that carries traffic between sites, cities and the core. Capacity, latency and resilience are set here, so it is designed as one system rather than link by link.

Scope

What the package covers

  • WDM/OTN optical transport for backbone and metro
  • Microwave and E-band backhaul links
  • IP RAN and router-based mobile backhaul
  • Synchronisation, network management and acceptance testing
Delivery

How the work runs

  1. Traffic study and transmission architecture (optical, microwave, IP)
  2. WDM/OTN design for backbone and metro, and link budgets for microwave and E-band
  3. IP RAN and router-based backhaul with synchronisation and protection
  4. Network management integration and acceptance test procedure (ATP)
Acceptance

How success is measured

Accepted on link performance, protection switching and synchronisation tests documented in the ATP.

Questions

Straight answers.

What is included in the Transmission: optical, microwave & IP backhaul package?

The scope covers wDM/OTN optical transport for backbone and metro; microwave and E-band backhaul links; iP RAN and router-based mobile backhaul; synchronisation, network management and acceptance testing. You receive Transmission design, Link budgets, ATP.

Who is it designed for?

It is typically used by operators and ISPs, utilities and pipelines and government and enterprise WANs, across Egypt and the wider MENA region.

How is acceptance measured?

Accepted on link performance, protection switching and synchronisation tests documented in the ATP.

Which engagement models are available?

This package can be delivered as turnkey or supply & integration. Every engagement starts with the same question: what has to work, by when, and how it will be measured.

Ready to scope this package?

Send the sites, the timeline and how success will be measured. We reply within one business day.