Seventeen proven packages we can mobilise now. Each one below shows who it is for, why it matters, the full scope, how the work runs, what you receive and how acceptance is measured.
Reliable 5G-ready coverage inside offices, malls, hospitals and venues.
Most mobile traffic now starts indoors, where outdoor macro sites cannot reach reliably. A designed indoor 5G layer gives predictable coverage and capacity where people actually work and meet.
Scope
Coverage survey and RF design
Supply of ZTE indoor 5G small cells
Installation, integration and optimisation
Acceptance against coverage and KPI targets
How it runs
Walk-test and RF survey of the building, floor by floor
Indoor RF design: small-cell positions, capacity per zone, transmission and power
Installation of ZTE indoor small cells, cabling and integration with the operator core
Optimisation drive-test and acceptance against agreed coverage and KPI targets
Who it is for
Office towers and corporate HQs
Malls, hotels and venues
Hospitals and campuses
Operators extending indoor coverage
You receive
RF designKPI reportPAC
Engagement models
TurnkeySupply & integration
Acceptance · Accepted on measured RSRP/SINR coverage maps and throughput KPIs per floor, signed in a provisional acceptance certificate (PAC).
Long-haul, metro and access fibre built and documented to standard.
Fibre is the long-life asset under every other service. Getting the route, records and testing right on day one avoids decades of faults and unknown spare capacity.
Scope
Route survey, HLD and LLD
Fibre cable, closures and GPON supply
Laying, splicing and termination
OTDR testing and as-built records
How it runs
Route survey, permits coordination and high-level design (HLD)
Low-level design (LLD): cable counts, closures, splitters and GPON plan
Trenching or aerial laying, splicing and termination by certified teams
OTDR and power-meter testing, as-built drawings and handover
Who it is for
Operators and ISPs
Real-estate developers and compounds
Industrial zones and campuses
Government and utilities
You receive
HLD / LLDOTDR reportsAs-built
Engagement models
TurnkeySupply & integration
Acceptance · Every link accepted on OTDR traces and loss budgets, with as-built route records delivered in editable format.
Radio sites built, connected and accepted on first pass.
Each site that fails first-pass acceptance costs weeks. A single team handling survey, RF build and testing removes the hand-offs where most delays start.
Scope
Site survey and RF planning
Antennas, feeders and RF components
Installation and commissioning
RF testing and acceptance
How it runs
Site survey, line-of-sight and RF planning
Supply of antennas, feeders, jumpers and RF components
Installation, power connection and commissioning
VSWR, PIM and RF testing followed by acceptance
Who it is for
Mobile operators
Tower companies
Private and industrial networks
You receive
Site packRF test resultsPAC
Engagement models
TurnkeySupply & integration
Acceptance · Site packs with photos, RF test results and commissioning records support first-time PAC.
The transport layer that carries traffic between sites, cities and the core.
Transmission is the layer that carries traffic between sites, cities and the core. Capacity, latency and resilience are set here, so it is designed as one system rather than link by link.
Scope
WDM/OTN optical transport for backbone and metro
Microwave and E-band backhaul links
IP RAN and router-based mobile backhaul
Synchronisation, network management and acceptance testing
How it runs
Traffic study and transmission architecture (optical, microwave, IP)
WDM/OTN design for backbone and metro, and link budgets for microwave and E-band
IP RAN and router-based backhaul with synchronisation and protection
Network management integration and acceptance test procedure (ATP)
Who it is for
Operators and ISPs
Utilities and pipelines
Government and enterprise WANs
You receive
Transmission designLink budgetsATP
Engagement models
TurnkeySupply & integration
Acceptance · Accepted on link performance, protection switching and synchronisation tests documented in the ATP.
White space, power and cabling delivered as one certified system.
White space, power, cooling and cabling only perform when they are designed together. Treating them as one certified system protects uptime and future capacity.
Scope
Data hall and white-space design
Racks, cabinets and aisle containment
Copper and fibre cabling with certification
Power distribution and site power
How it runs
Data hall design: layout, power train, cooling and containment
Supply of racks, cabinets, aisle containment and PDUs
Copper and fibre structured cabling with channel certification
Site power integration, labelling and as-built documentation
Who it is for
Enterprises and banks
Government and public data centres
Colocation and cloud providers
Hospitals and universities
You receive
Design packCabling certificationAs-built
Engagement models
TurnkeySupply & integration
Acceptance · Cabling certified channel by channel; power and containment checked against design before handover.
Campus and branch networks that are fast, secure and centrally managed.
Users judge IT by the network they touch every day. A designed campus and branch network with central management keeps performance and security consistent across every site.
Scope
Campus and branch network design
Switching, routing and gateways
High-density Wi-Fi
SD-WAN for multi-site estates
How it runs
Requirements and site surveys, including Wi-Fi predictive and on-site surveys
Low-level design of switching, routing, gateways and segmentation
Deployment of high-density Wi-Fi and SD-WAN across branches
Testing, configuration records and optional managed service
Who it is for
Corporate campuses
Multi-branch enterprises and retail
Hotels, schools and hospitals
You receive
LLDConfiguration recordsATP
Engagement models
TurnkeyManaged
Acceptance · Accepted on coverage, roaming and throughput tests plus configuration and IP records.
IT infrastructure: servers, storage & virtualisation
Compute and storage platforms sized, built and supported for the workload.
Compute and storage have to be sized for the workload, protected by backup and ready to extend into the cloud. We design for performance today and growth tomorrow.
Scope
Servers, storage and backup
Virtualisation and private cloud platforms
Data-centre networking and security
Migration, monitoring and support
How it runs
Workload and capacity assessment
Solution design: servers, storage, backup and virtualisation
Build, data-centre networking and security integration
Migration, monitoring set-up and support handover
Who it is for
Enterprises modernising on-premise IT
Government entities
Banks and regulated organisations
You receive
Solution designBuild recordsATP
Engagement models
Supply & integrationManaged
Acceptance · Accepted on performance and failover tests, with build records and runbooks.
A measured reduction in exposure across networks, sites and endpoints.
Exposure is reduced by measuring it first, then closing the gaps in priority order. Prevention-first technology from Aegis, represented exclusively by Novatelx in Egypt, sits at the centre.
Scope
Risk and vulnerability assessment
Perimeter, network and endpoint hardening
DDoS and telecom-specific controls
Security awareness and technical training
How it runs
Risk and vulnerability assessment across networks, sites and endpoints
Prioritised remediation plan agreed with the client
Perimeter, network, endpoint and DDoS hardening
Security awareness and technical training for client teams
Who it is for
Operators and critical infrastructure
Banks and government
Industrial and OT environments
You receive
Risk reportRemediation planTraining
Engagement models
ConsultingTurnkey
Acceptance · A measured before-and-after exposure report, remediation evidence and training records.
Legally robust digital signing, identity and evidential archiving.
Paper signatures slow every process. Qualified electronic signature and evidential archiving make digital documents legally robust and verifiable over the long term.
Scope
Qualified electronic signature
Digital identity and trust services
Evidential long-term archiving
Integration with business systems
How it runs
Process and legal-requirement review
Integration design with existing business systems
Deployment of signature, identity and archiving services
Testing, user enablement and acceptance
Who it is for
Government and public services
Banks and insurers
Enterprises digitising approvals
You receive
Integration designATP
Engagement models
Supply & integration
Acceptance · Accepted on end-to-end signing and verification tests against the integration design.
Operations, billing and payments platforms that talk to each other.
Operations, billing and payments must talk to each other in real time. Integrated platforms reduce revenue leakage and give customers faster, safer transactions.
Scope
OSS/BSS and telecom IT platforms
Billing and revenue management
Mobile payments and wallets
Fraud and risk controls
How it runs
Current-state review of OSS/BSS and billing
Solution design and integration architecture
Deployment of billing, wallet and payment platforms with fraud controls
Integration testing, migration and go-live support
Who it is for
Telecom operators
Banks and payment providers
Utilities with billing operations
You receive
Solution designIntegration tests
Engagement models
Supply & integrationManaged
Acceptance · Accepted on integration test results and reconciled billing and payment flows.
Custom software that connects your teams, customers and platforms.
Off-the-shelf tools rarely fit the way a business actually works. Custom software built by our development team connects people, customers and platforms around your own process.
Scope
Web portals and enterprise applications
Mobile apps for customers and field teams
APIs and integration with OSS/BSS, ERP and CRM
Dashboards, reporting and process automation
How it runs
Requirements workshops and a written specification
UX design and agile development in short sprints
Integration through APIs with OSS/BSS, ERP and CRM
User acceptance testing, deployment and support
Who it is for
Enterprises and government entities
Operators and service providers
Field-service organisations
You receive
Requirements specSource code & documentationUAT
Engagement models
TurnkeyManaged
Acceptance · Accepted through user acceptance testing (UAT); source code and documentation are delivered with the system.
Lower diesel and grid spend across the site estate.
Diesel and grid costs dominate site operating budgets. Solar sized for the real load cuts fuel spend and emissions while improving power availability. More than 400 sites delivered.
Scope
Load assessment and PV sizing
PV arrays, mounting and inverters
Integration with existing site power
Commissioning and performance monitoring
How it runs
Load assessment and energy study
PV sizing, mounting and inverter design
Installation and integration with existing site power
Commissioning and performance monitoring
Who it is for
Telecom operators and tower companies
Off-grid and remote sites
Industrial and commercial rooftops
You receive
Energy studyCommissioning report
Engagement models
TurnkeySupply & install
Acceptance · Accepted on commissioning tests with an energy-yield baseline for performance tracking.