Novatelx Discuss a requirement
Home/Services
Project & managed services

From first survey to final acceptance.

Every stage delivered under one contract, with a defined gate and documented outputs, then operated and supported for the life of the network. Below: the ten delivery stages, our managed services, engagement models and what makes the approach different.

10 stages · 1 contract
Project delivery

Ten stages, each with a gate.

Every stage has defined outputs, so progress is visible and acceptance is never a surprise.

01

Survey & requirements

Site surveys and workshops define what has to work, by when, and how it will be measured.

Site survey reportRequirement specification
02

Design

High- and low-level design across fibre, RF, IP, power and security, architecture before vendor.

HLDLLD & drawings
03

BOQ & procurement

Vendor-independent bill of quantities, sourced from the partner ecosystem with transparent commercials.

Bill of quantitiesProcurement plan
04

Supply & logistics

Delivery, customs clearance, warehousing and site delivery with material reconciliation.

Delivery notesMaterial reconciliation
05

Installation

Civil, power, cabling and equipment installation by qualified field teams, to standard.

Installation reportPhoto log
06

Integration & configuration

Multi-vendor systems configured and integrated, with interfaces proven before go-live.

Configuration recordsIntegration test results
07

Testing & commissioning

Optical (OTDR), RF, performance and security testing against agreed acceptance criteria.

Test reportsATP
08

Acceptance & handover

Provisional and final acceptance, as-built documentation and training for client teams.

PAC / FACAs-built packTraining
09

Managed operations

24/7 NOC and SOC monitoring, preventive and corrective maintenance, spares and SLA reporting.

SLA reportsIncident log
10

Optimisation & lifecycle

Capacity planning, upgrades, energy optimisation and technology refresh over the life of the network.

Optimisation roadmapLifecycle plan
Managed services

Run, maintained and measured.

For clients who would rather consume availability than staff it.

24/7 NOC & SOC monitoring

Network and security operations with incident response and escalation.

Preventive & corrective maintenance

Scheduled site visits, fault restoration and spare-parts management.

Performance reporting

Availability, ticket and service-level reports against agreed targets.

Upgrades & optimisation

Capacity planning, technology refresh and energy optimisation.

Contact centre & CX outsourcing

Inbound, outbound, helpdesk and omnichannel customer operations as a service.

Field maintenance & outsourcing

Qualified technicians for preventive, corrective and emergency work.

Engagement models

Choose how you work with us.

The same process and standards apply to every model.

Turnkey

One contract from survey to final acceptance.

Best for new builds and rollouts

Supply & integration

Partner platforms supplied, installed and integrated with what is already running.

Best when design is settled

Managed services

Availability consumed as a service under SLA.

Best for 24/7 operations

Consulting

Architecture, assessment and design reviews before you commit.

Best at the start of a programme

Outsourcing

Teams for field work, contact centres and operations.

Best for variable demand
Market edge

Why clients choose this model.

What changes when one integrator owns delivery end to end.

One contract, one escalation point

Survey to acceptance and operations under a single accountable partner.

Gates with documented outputs

Each stage closes with records the client can audit.

Acceptance agreed first

Success criteria defined before work starts, not argued at the end.

Run what we build

The same team supports the network for its working life.

Market edge

The difference in practice.

How this service compares with the way it is usually bought and delivered.

Typical approach
With Novatelx
✕Separate contractors per stage
✓One contract from survey to operations
✕Acceptance argued at the end
✓Acceptance criteria agreed before work starts
✕Records assembled after handover
✓Documented outputs at every gate
✕Hand over and walk away
✓Operated and optimised for the life of the network

◎What we measure

  • Delivery against schedule and gates
  • First-pass acceptance rate
  • Availability and SLA compliance
  • Time to restore service

⛨Risks we remove

  • Hand-off gaps between contractors
  • Late or failed acceptance
  • Missing as-built records
  • Nobody accountable after go-live

One contract, every stage.

Tell us the scope and the timeline. We reply within one business day.